Get Lit Electrical
06/17/2026
A lot going on here… but we are ready for the insulator to spray foam the walls.
06/04/2026
200a heavy up
06/04/2026
2G switch cut in and 5 new 6” recess lights installed.
Stairwell lights replaced with new ballast bypass lamps.
Moved pull station over closer to door so future equiptment installation won’t cover pull station.
05/31/2026
5 holes core drilled and poke through outlets installed for medical chairs.
05/29/2026
100a 3 phase sub panel set and ready to feed a PPE washer and dryer.
05/29/2026
Next time you’re at Maryland International Raceway, check out our new sign.
05/29/2026
200a Heavy up and whole house rewire completed.
05/29/2026
New exterior fixtures and new ceiling fans installed.
05/29/2026
200a pole service ready for service inspection.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Wheaton, MD