Elevate Structures
Inside our Graniteville manufacturing plant, roll-up doors and hallway systems for self-storage are being produced with precision, speed, and quality control.
This is the advantage of true vertical integration and why Elevate is different from every other primary framing subcontractor:
- Unmatched steel purchasing power through integrated manufacturing
- Dedicated logistics and supply chain control
- Single-source accountability from mill to jobsite
- The industry’s most comprehensive product line
When you own the process, you don’t pass the buck—you deliver. That’s how we back up the title America’s Super Subcontractor.
How did we earn “America’s Super Subcontractor”?
Through 20 years of experience, completing 1,750+ projects nationwide, 350 Alpha Framing System installations, 1,400 dedicated employee owners, and 13 U.S. manufacturing plants.
Vertical integration with Central States Manufacturing means we manage the full supply chain from mill to install, delivering tighter quality control, shorter lead times, and dependable ex*****on in every market we serve.
Proven in over 350 buildings across the United States, our innovative Alpha Framing System is fast, scalable, and economical, engineered to get you to the roof faster.
But what our partners point to the most? The team. Our dedicated regional teams don’t hand projects off — they stay with you, start to finish, which means smoother builds, faster answers, and real collaboration.
Looking for a proven super subcontractor that gets you to the roof faster and stays with you through every build? We’d love to help.
Contact us: https://elevatecs.com/contact-us/
12/23/2025
Merry Christmas and Happy Holidays from Elevate Structures! 🎄
As the year winds down and the season of celebration begins, we’re reflecting on what makes Elevate Structures truly stand out — the people, partnerships, and trust behind every build.
We’re grateful for our customers who continue to put their confidence in our team and systems.
For our partners, whose collaboration and expertise turn possibilities into reality.
And for our employee-owners, who consistently deliver on our mission to be on-site, on-schedule, all the time.
12/18/2025
If you’re closing out 2025 with continuing education credits still on your checklist, here are 3 reasons to check out our AIA-approved, HSW-certified course, “Fast, Scalable, Economical: The Benefits of Building with an Innovative Cold-Formed Steel Framing System (CFS).”
The course explains how our CFS post-and-beam Alpha Framing System consistently delivers measurable advantages:
📆 Earlier Openings — schedule compression that gets you to the roof faster and lets facilities open sooner
📊 Faster Revenue Generation — a framing system that accelerates occupancy and income realization
👷 Reduced Labor Costs — one crew installing up to 15,000 sq. ft. per week, minimizing trade dependencies and simplifying ex*****on
Earn your credits before year-end: https://bit.ly/3VTZpCn
Some jobsites are messy enough without a framing system adding to the chaos.
We were onsite yesterday in Lawrenceville, GA, with our partners at Spartan Construction where recent rain has turned the ground into a staging challenge of its own.
But this is exactly where the Alpha Framing System proves its worth: components are compact, stackable, and transport-efficient, allowing crews to maneuver materials efficiently—even in tight, wet, or heavily restricted sites. And because cold-formed steel isn’t affected by rain, snow, or humidity, even on the messiest days, Alpha keeps the schedule moving.
Click here to claim your Sponsored Listing.
Contact the business
Telephone
Website
Address
3807 Carrollton Villa Rica Highway
Villa Rica, GA
30180
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |