Demo Dog Demolition
It’s true! CALL (941-DEMO-DOG) today!! 📞
07/19/2026
Another one coming down. Large motel demolition underway in Pasco County. Precision, planning, and power—let’s get to work. 💥🚧
Ever wonder what the house looks like instead before being demolished?? Check it out!!!
07/04/2026
Happy 4th of July from the Demo Dog crew! 🇺🇸💥
Wishing you a safe, fun holiday with family and friends. Thank you to our amazing clients, hardworking crew, and everyone who supports Demo Dog.
Land of the free and home of the brave!
Freedom USA
In an industry where everyone looks the same, Demo Dogs does things differently. 💥
4 days in Belleair Beach.
House gone. Pool gone. Clean slate.
Relentless work. The right equipment. A crew that gets it done. 🏗️🐾
06/14/2026
Proud of our East Coast operation for successfully completing the demolition of this 50,000 sq ft building in just 30 days. A fast-paced project that required coordination, efficiency, and hard work from start to finish. Another job completed safely and on schedule. 💪🏗️
06/11/2026
🏗️ Future Demo Project – Motorola Employment & Records Building 🏗️
Demo Dog is set to take on a selective demolition project W Sunrise Blvd, Plantation, FL the former Motorola Employment & Records Building.
This project encompasses approximately 325,000 square feet and will require a detailed, methodical approach. As a selective demolition, crews will carefully remove designated interior and structural components while preserving areas slated to remain, making precision and coordination critical throughout the process.
With decades of history tied to Motorola’s operations, the building represents a significant piece of the area’s corporate past. Demo Dog will utilize specialized equipment and experienced crews to safely and efficiently prepare the site for its next phase of redevelopment.
Stay tuned as we transform this former Motorola facility and help pave the way for its future use.
06/02/2026
Demo update from Redington Beach 🏗️
Our team is currently demolishing the former Sandwood Beach Resort. This is a challenging project due to the construction of the building—each individual unit is concrete, which means we have to separate and remove the C&D material throughout the process rather than simply bringing the structure down all at once.
A lot of sorting, a lot of loading, and a lot of machine hours, but the crew is making steady progress.
Different sites. Different challenges.
Same result: clean, fast, and professional demo.
isn’t about destruction. It’s about making space to rebuild the right way.
Contact us today to get your free quote.
Click here to claim your Sponsored Listing.
Category
Website
Address
Tampa, FL
33601–33626, 33629–33631, 33633–33635, 33637, 33646, 33647, 33650, 33655,
Alerts
Be the first to know and let us send you an email when Demo Dog Demolition posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.