Lourdi Home Remodeling
05/21/2026
Love how this tile job turned out, thankful for our amazing client for the opportunity to work with their projects.
Give me a call for all your tile, and all flooring projects, God bless 🙏😊
( Pt.1 bay magnolia project 1st floor )
Love how the transformation of this house at bay magnolia in santa rosa beack turned out.
-2 coats primer walls, ceiling & trims
-2 coats paint walls, ceilings & trims
- 2 coats paint exterior doors
- coats paint front and back patio hardy siding & post & beam
- drywalls repair and texture
-All New exterior and interior ceiling fans installed
-All exterior and interior light fixtures installed
- All new light switches, gfci and receptacle replaced
- replace all old blinds to new ones
- new porch screen install
- convert double sink to single large sink and adding a garbage disposal feature
- refinish bedrooms wood floor with clear coat
- regrout master bathroom
This house is ready for rental, yall give me a call for your home improvement projects, God Bless 🙏😊
03/12/2026
Love how this floor transformation looks. From previous linoleum flooring to now beautifully selected LVP flooring, our team is so blessed to have this opportunity to serve our clients. Give us a call for all your flooring and home improvement projects. God bless.
Love the transformation of this bathroom, Give is a call for all your home remodeling projects.
new bath, new Quartz countertops with black sink, new hardware faucet fixtures, vanity handle, bathroom fixtures, new flooring, trim job on baseboards and framing mirror, new wall & trim paint, & new cabinet paint
12/27/2025
Love how this KidKraft swing set turned out. Assembled by our skilled team, please contact us for all your project needs. God bless!🤙🏾
12/24/2025
Love the transformation of this bathroom, give us a call for your bathroom remodeling projects.
What goes into this transformation :
Plumbing :
-replace old shower only valve to new tub & shower valve combo, add new hot and cold water supply lines valve for a new double sink vanity
-Replumb drain lines to a new location of drain For both new tub shower and new double vanity
-installed double vanity faucets and drain lines to the new drain lines.
-installed new toilet.
Electrical : install new toilet/bathroom exhaust fan, relocate gfci, relocate new vanity light fixture lines and shower light switch, & installed light fixtures.
Drywall : installed new drywall, add knockdown texture, prime and paint.
Flooring : installed LVP & new Baseboards
Cosmetic : built shelving, stained & installed towel hangers and toilet paper holder.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
Santa Rosa Beach, FL
32459
Opening Hours
| Monday | 9am - 5pm |
| Tuesday | 9am - 5pm |
| Wednesday | 9am - 5pm |
| Thursday | 9am - 5pm |
| Friday | 9am - 5pm |