B.Shortridge Construction
03/31/2022
Grading for new parking lot D.G Castalia..
03/31/2022
New ODOT concrete pipe work. Added A new 30 inch concrete pipe along with a 24 inch concrete pipe. With water pumps running 24 hours a day. To keep the water Constantly flowing And keep the work area dry for working.. Very cold and tough task..
03/31/2022
Elks lodge in Port Clinton. New 20 x 70 exterior concrete slab.. We were asked to help with new barbecue pit/grilling area.. We added a colored top with a rock faced edging..
11/22/2021
Thomas Steel Bellevue
11/22/2021
Heated shop floor..
11/22/2021
New Campground Clyde.. New Treatment plant ..
11/22/2021
D.G Castalia
11/22/2021
Dunkin Clyde ..Start to finish!!
11/22/2021
New road for Chipotle Fremont
04/21/2021
Provided Large excavator for removal of material on site. Peninsula motel. Marblehead Ohio
Moving large excavator to next project..