Reliable Home Remodeling & Construction
03/11/2026
12/03/2025
Conversion of 1/2 bathroom into a full bathroom
10/23/2025
Shower remodel in 7 days $14,000
Bathroom makeover in 10 days
05/31/2025
Budget bathroom renovation in 10 days
05/20/2025
New bathroom addition in Larkspur
Tips to homeowners for Bathroom or Kitchen remodel, when calculating a cost of the project.
What Homeowner and Contractor pay for:
* Contractor pays Recycling fee for waste disposal
* Contractor provides rough materials
Rough materials:
1. Lumber, plywood, sheetrock, baker boards
2. Cement, concrete, mastic, redgard
3. Screws, nails, fasteners
4. Rough plumbing (fittings, pipes)
5. Rough electrical (conduits, wires, boxes)
* Homeowner pays for permits
* Homeowner pays for finish materials (contractor can offer “contractor discount” at specific stores)
Finish materials:
1. Any plumbing appliances and fixtures
2. Any electrical, mechanical appliances, light fixtures
3. Doors and windows
4. Cabinets, vanity, mirrors
5. Tiles and grout (floor and shower)
6. Baseboards, trims, schluters
7. Paint
8. Any additional finish materials not listed here
02/17/2025
A typical 9'x5' bathroom renovation. A total turnover time was 10 business days. In-kind remodel (non-structural, no plumbing or electrical modification): $20,000 (labor and rough materials).
01/10/2025
2 Bathrooms upscale remodel
Click here to claim your Sponsored Listing.
Contact the business
Address
San Rafael, CA
94903
Opening Hours
| Monday | 9am - 6pm |
| Tuesday | 9am - 6pm |
| Wednesday | 9am - 6pm |
| Thursday | 9am - 6pm |
| Friday | 9am - 6pm |