Buehler

Buehler

Share

08/21/2023

Buehler's success is achieved through the hard work and dedication of our people. Please join us in celebrating those who were recently recognized with promotions for 2023!

Photos from Buehler's post 08/21/2023

Buehler’s own Ryan Kersting recently had the honor to address the White House! Ryan participated in an online presentation for the Executive Office of the President as part of a select group of national experts. The presentation titled "Our Nation’s Seismic Risk" covered topics such as the latest estimates of earthquake risk to US communities and suggested actions that can be taken by Congress. Recognized as an expert based on efforts within California and with various Federal agencies, Ryan’s focus has been on the emerging topic of designing buildings for improved post-earthquake Functional Recovery in support of better community resilience. Buehler is proud of Ryan’s trailblazing in our industry and celebrates this incredible opportunity!

LinkedIn 08/11/2023

Join Buehler, along with Swinerton Builders, Timberlab, and Dreyfuss + Blackford Architecture for the Timber Talks event on August 23rd. Held at Urban Roots Brewery in downtown Sacramento, the event will include house-made beers and a conversation on sustainable design using mass timber, featuring Buehler President Scott Ho**er as one of the panelists.

Registration for this event is open until August 14th with limited space. Click the link below to register!

https://timbertalkssacramento2023.splashthat.com/?gz=7c165cb0d45eb9039b738d41a07ded9e&guest-access-hash=NDU4NzU2MTgzfDY1OTM5NzA5M3wxNjkwNDc1NTU2O2U2YzBkZGM1YTllMDExYmU1MzA5MTJmNzk3ZGFlNDQ1ZDk3YjYxMGJiMDQ2NjFkOGU4ZjdmZWUyYTAxY2FjM2Y=

LinkedIn This link will take you to a page that’s not on LinkedIn

Photos from Buehler's post 08/04/2023

The final shape of the Resources Building Renovation in downtown Sacramento is coming into focus! This renovation includes the strengthening of the lateral and foundation systems along with the complete replacement of the stairs and elevators to update the accessibility of the building from top to bottom. The old exterior facade is halfway removed, exposing some of the newly installed fluid viscous damper bracing system provided by Taylor Devices, which retrofit the existing truss moment frame system designed in the 1960s. With construction moving right along, we are looking forward to unveiling this striking River City rehab!

Something from Nothing Episode #4: Daryl Friglliana, PE 07/14/2023

Buehler’s own Daryl Frigillana was featured in a mini-documentary series called “Something From Nothing”! This series, created by Khatri International Inc. in conjunction with the Structural Engineers Association of Southern California, sheds light on the incredible people in the structural engineering industry. Click the link to hear Daryl’s journey into engineering!

Something from Nothing Episode #4: Daryl Friglliana, PE Episode #4 tells the story of Daryl Friglliana and his journey towards becoming a structural engineer. I'm pleased to introduce this segment in association w...

Want your business to be the top-listed Engineering Company in Sacramento?
Click here to claim your Sponsored Listing.

Telephone

Address


600 Q Street
Sacramento, CA
95811

Opening Hours

Monday 7am - 6:30pm
Tuesday 7am - 6:30pm
Wednesday 7am - 6:30pm
Thursday 7am - 6:30pm
Friday 7am - 6:30pm