Past Tense Project
08/21/2025
Progress photos: In this project, I closed in a missing floor section where a spiral staircase used to be between the 2nd and 3rd levels. We added drywall to finish the 2nd-floor ceiling and installed new wood flooring above on the 3rd floor. The client requested a custom floor grate to keep airflow moving between the levels, blending function with a clean finish.
#1904
07/13/2025
Here’s a recent bathroom restoration project I completed. The trim around the shower had sustained water damage due to the original builder using MDF trim—an unsuitable choice for high-moisture areas. Over time, the MDF absorbed water, leading to swelling, rot, and mildew. If left unaddressed, these issues can escalate and compromise surrounding materials. I removed the damaged trim and replaced it with PVC trim, a far more durable and appropriate solution. PVC is water-resistant, mold and mildew resistant, low maintenance, and built to last—making it ideal for bathroom environments.
Click here to claim your Sponsored Listing.
Category
Contact the public figure
Telephone
Website
Address
103 South Third Street
Rogers, AR
72756