Grand Flying Club
Hanger Report (Doug Baker)
Rod and i met at 1000 hours today and completed the fixed intercom including making a few headset jack repairs. The intercom was trsted in the hanger and worked properly. The ac has been reassembled except gor the seats. I left them outv so that the seat covering could be conditioned.
There is no conditioner in the hangers.
The cbs to replace yhe fuse holders will be here late thursday. Someone can install them with Rods direction. Log book entry needs completed.
04/04/2026
12/20/2025
Today at the hanger we removed the magneto and performed the timing process on it. We reinstalled it and we are ready to test it as soon as the battery is charged.
Click here to claim your Sponsored Listing.
Category
Contact the organization
Website
Address
6751 Woodrum Cir, Hanger C24/25
Redding, CA
96002