Deep Excavation
06/26/2026
"Designing diaphragm walls is not just about defining a section.
In real projects, the challenge is understanding how the wall behaves through construction:
π Which stage governs the design?
π Are your moments driven by early excavation phases?
π Are you overdesigning reinforcementβ¦ or missing critical checks?
With DeepEX, you can model the full excavation sequence, analyze results stage-by-stage, and optimize both wall sections and supports within one workflow.
How do you usually verify your diaphragm wall design β stage-by-stage or only at final conditions?
"
"ποΈ Are you still transferring superstructure reactions into foundation models manually?
This is one of those workflows that can easily become:
π Time-consuming
π Error-prone
π Difficult to verify
Especially when multiple load combinations are involved.
In this video, we show how loads can be imported directly from ETABS into DeepFND for single pile analysis.
β Export joint reactions from ETABS
β Import the reactions directly into DeepFND
β Automatically generate pile design sections
β Analyze axial and lateral pile behavior for all load combinations
Because foundation design becomes much more efficient when the superstructure and foundation workflows are properly connected.
How are you currently transferring loads between your structural and foundation models?
"
"ποΈ How much time do you spend just setting up excavation models before the real engineering even begins?
For many projects, model generation itself becomes a bottleneck.
π Defining stages manually
π Adjusting support elevations
π Assigning wall sections
π Configuring load combinations and groundwater conditions
β¦and repeating the process every time a design changes.
In this video, we show how the DeepEX Model Wizard can generate complete excavation models β including construction stages β in just minutes.
β Select the project type
β Define soils and stratigraphy
β Adjust walls and supports
β Apply surcharges and design codes
β Generate the full staged model automatically
Because faster model setup means engineers can spend more time evaluating behavior, optimizing designs, and reducing project risk.
What part of the excavation model setup usually takes the most time in your workflow?
"
"π Are you analyzing your bridge abutments as simple retaining wallsβ¦ while ignoring how the piles actually interact with the system?
Pile-supported abutments are not just walls with foundations.
π Backfill pressures
π Pile stiffness
π Groundwater conditions
π External surcharges
π Soilβpile interaction
β¦all influence the final behavior of the structure.
In this video, we show how to:
β Create a pile-supported abutment model in DeepEX
β Define pile layouts, geometry, and reinforcement
β Simulate staged backfilling and external loads
β And review wall and pile stresses, moments, shears, and displacements
Because understanding how the wall and piles work together can significantly improve both design efficiency and project reliability.
How detailed is your typical pile-supported abutment analysis workflow?
"
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
7700 Windrose Avenue #G300
Plano, TX
75024
Opening Hours
| Monday | 11am - 12pm |
| Tuesday | 11am - 12pm |
| Wednesday | 11am - 1pm |
| Thursday | 11am - 1pm |
| Friday | 11am - 12pm |