GWHS Engineering
Using this 15kV,60mA neon sign transformer (set up as a Jacob’s ladder in this video) as the primary coils power source for the Tesla coil.
06/08/2017
This is a 5HP Tecumseh snow blower engine on display in the classroom, cut open to show the crankcase and combustion chamber. The pull starter works to turn all the internals.
04/07/2017
The class took a tour of the biolers and generators. Here the are walking at ground level. The pits to the left were for coal ash from the old boilers.
03/15/2017
We've been working on a go cart that could not steer properly due to a solid rear axle. With new brackets and bearings, this machine will be ready to roll.
The second scooter is running!
Click here to claim your Sponsored Listing.
Category
Culinary Team
Attire
Website
Address
Philadelphia, PA
19116