Drexel Master Plan

Drexel Master Plan

Share

Photos 08/15/2016

One of the projects in the research laboratory plan being implemented at Drexel will provide new facilities for research in synthetic chemistry in the Center for Automation Technology. Primary infrastructure work is finished, and the walls are being framed. The project is scheduled for a December completion:

https://drexelmasterplan.wordpress.com/2016/08/15/chemistry-research-laboratories/

Photos 08/05/2016

The golden age of aerial photography coincided with the construction of 30th Street Station, as commercial uses expanded for fixed-wing aircraft. This 1931 photograph of 30th Street Station under construction includes the Main Building of the Drexel Institute of Technology on the right edge of the image in the 3 o’clock position:

https://drexelmasterplan.wordpress.com/2016/08/05/flashback-friday-2/

Photos 08/04/2016

The first construction progress photograph taken on the Drexel campus by a drone took place yesterday at Vue32, the joint venture between Drexel and the Radnor Property Group at the intersection of 32nd & Race Streets. The mixed-use residential and child-care development is designed by Erdy McHenry Architects and built by TN Ward:

https://drexelmasterplan.wordpress.com/2016/08/04/drone-shot/

Photos from Drexel Master Plan's post 07/27/2016

The steel frame is being erected at Vue 32, the mixed-use development by the Radnor Property Group on the Drexel campus at 32nd & Race. This was a tough week to be an Iron Worker or a Roofer:

https://drexelmasterplan.wordpress.com/2016/07/27/iron-work-at-vue-32/

Want your university to be the top-listed University in Philadelphia?
Click here to claim your Sponsored Listing.

Address


Philadelphia, PA
19104