Moorhead Engineering

Moorhead Engineering

Share

09/17/2020

Survey technician. Experience preferred but will train the right individual. Must be comfortable being outside all day, have a driver's license and reliable transportation, Able to follow instructions and communicate clearly. Must be drug free. Must be physically able to complete required task (digging, cutting brush with machete, hammering, lift up to 30lbs, hop fences etc) must be able to read a tape measure. Quick learner and self starters a plus.

Photos 01/21/2020

Remember, surveyors are people, too. Give your favorite a hug and let them know you appreciate them.

Photos 12/18/2019

ICYMI: Frosty the Surveyor https://rpls.news/2EtKLtT

11/06/2019

Rodman/eye-man
Must have survey experience. Mortgage/Title, Boundary, Topo and construction lay out. Topcon instruments/GPS/Survey Pro software a plus

10/30/2017

10/30 Today in Florida History from the Florida Historical Society!

1963 – The current Alvin G. Shands Bridge was dedicated on this date. The two lane steal stringer beam-type bridge spans the St. John’s River connecting Orangdale on the eastern shore of the river with Green Cove Springs on the western shore; a total span of 6662 ft. Until the opening of the I-295 Henry Holland Buckman Bridge in 1970, the Shands Bridge was the only crossing between Jacksonville and Palatka.

08/31/2017

Do you know where your property corners are? Planning on building a fence? Getting a new shed? Is the neighbors driveway crossing your property? Moorhead Engineering can help you. Give us a call today!

Want your business to be the top-listed Engineering Company in Ocala?
Click here to claim your Sponsored Listing.

Telephone

Address


305 SE 1st Avenue
Ocala, FL
34471

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm