WZC Networking LLC
05/13/2026
A failed radio coverage test led Century Plastics to evaluate ERCES requirements across two manufacturing facilities in Macomb Township.
The challenge was not just meeting code. It was finding a solution that matched the actual coverage gaps without unnecessary cost or complexity.
WZC Networking reviewed the existing proposal, analyzed the site conditions, and developed a clean, practical ERCES design focused on compliance, reliability, and long term serviceability.
The result was a right sized system built to support AHJ approval and operational confidence moving forward.
Wireless Infrastructure Designed Once. Done Right.
Your donor antenna is exposed to the elements every day.
Over time, weather, connection wear, and environmental changes can impact system performance. Routine maintenance helps keep your ERCES system reliable, compliant, and ready when it matters most.
05/04/2026
Design doesn’t stop on paper.
Live AP testing at Cranbrook to validate real world coverage before install and eliminate guesswork. Wireless infrastructure designed once. Done right.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
24371 Catherine Industrial Drive
Novi, MI
48375
Opening Hours
| Monday | 7am - 7pm |
| Tuesday | 7am - 7pm |
| Wednesday | 7am - 7pm |
| Thursday | 7am - 7pm |
| Friday | 7am - 7pm |