P.F. Adams Construction

P.F. Adams Construction

Share

02/01/2024

Getting double washed stone from plympton sand and gravel

Photos from P.F. Adams Construction's post 02/01/2024

This system that we just finished up in Norwell was two 60’ long trenches with double washed stone and perforated pipe. We first pumped and collapsed the old tank and installed a new 1500 gallon tank. We then laid out the leaching field and replaced the dig with Perc sand. Once we finished placing the sand we configured our trenches and then backfilled with existing material. Working during the winter presents other challenges, mostly the weather, but we get it done no matter what. 😎😎😎

Photos from P.F. Adams Construction's post 09/06/2023

This system we just finished up in pembroke consisted of 15 concrete leaching chambers, perc sand and double washed stone. We started by crushing the old tank and installing a new 2,000 gallon tank. Next, we set the chambers and brought in the perc sand and stone. We then laid filter fabric across the whole field to keep it free of any dirt. We finally backfilled with existing material onsite. I also made a quick retaining wall with the boulders I excavated.

Photos from P.F. Adams Construction's post 05/25/2023

This system consisted of 3 rows of high capacity infiltrators and perc sand. We first started by pumping and collapsing the old 1000 gallon tank and installing a new 1500 gallon tank. We then tied the laundry in with the new system. Once we configured the leaching field we back filled with clean gravel material and perc sand.

03/21/2023

Need a title V inspection? Give us a call! We are licensed title V inspectors! Get all of those pesky tasks out of the way so you can sell that house!

Want your business to be the top-listed Engineering Company in Norwell?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Main Street
Norwell, MA
02061