The Wassi Group
05/25/2026
On Memorial Day, we pause to honor and remember the brave men and women who gave everything in service to our country.
From all of us at The Wassi Group β thank you.
We hope you and your families have a safe and restful Memorial Day.
05/04/2026
π¨οΈ Did you know TWG has an in-house print shop?
Whether you need a single permit set or prints for a full construction schedule, we produce accurate, large-format plans that your team can actually work from β no guesswork on site.
We serve architects, contractors, engineers, and facility managers throughout Central Illinois and beyond. Have a project coming up? We'd love to help!
β‘οΈ https://wassigroup.com/construction-printing-services-central-illinois/
04/09/2026
When youβre planning work around existing structures, you need to know exactly whatβs already there β not what the drawings say might be there.
For a recent project at Alto Ingredients, our team used 3D laser scanning to capture the full existing conditions of a pipe trestle section and its relationship to the adjacent building exteriors. From that scan data, we built a coordinated Revit model their team can actually plan from β with confidence.
Accurate data before the work begins. Thatβs what we do.
π https://wassigroup.com/case-study-alto-ingredients-steep-to-mill-pipe-trestle/
Know someone managing a facility who could use reliable existing conditions documentation? Tag them below!
The Cost of Inaccurate Documentation β Is Your Facility at Risk? When outdated drawings are all you have to plan from, costly field conflicts are almost inevitable. See how The Wassi Group used 3D laser scanning to capture accurate existing conditions on an industrial pipe trestle β and gave Alto Ingredients a reliable foundation to plan from with confidence.
02/26/2026
From Sketches to Build-Ready Home Plans
Gene Myers had a vision for his forever home β starting with hand sketches.
He needed clear plans builders could trust.
The Wassi Group converted those concepts into accurate custom home plans and a coordinated 3D model β enabling confident pricing, permits, and construction.
β Layout confirmed before build
β Clear drawings for contractors
β 3D visualization
β Reduced interpretation risk
A dependable foundation for building the Myers family home.
Full Case Study ποΈ https://wassigroup.com/myers-residence-custom-home-plans/
Myers Residence β Custom Home Plans from Client Sketches TWG transformed hand-drawn sketches into accurate custom home plans and coordinated documentation, giving the Myers family a clear path to confident construction.
Click here to claim your Sponsored Listing.
Category
Website
Address
208 S 1st Avenue
Morton, IL
61550
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |