REGULAR PROJECTS
Pool Tile We have started the project on the pool deck; we are grouting and sealing the wood like tile. Project should take two to three weeks, therefore they should be done by mid March give or take.
Decorative Stucco Overlay
We have finalized the contract negotiations and will be signing contract by end of this week and start the mobilization. The Engineer has already started working on the plans to present to the city for permits. We will continue to update you on this. We will be starting on the Marina areas since it is the one with most damage.
Townhouse Doors
We are currently in receipt of three bids to replace the townhouse doors facing the pool area. These doors are 90 minute fire rated exterior doors and are in need of replacement. We will be reviewing all bids and update you on start date as soon as possible.
Trash Room Awning
Awnings have been installed; however we have found cigarette buds all over the top of this awning. These awnings were expensive and it’s a shame that is being damaged by residents throwing ci******es over their balconies. We are asking that you please refrain from throwing anything over your balcony, specially a lit cigarette as it is a fire hazard.
Chaise Lounges
All of the chaise lounges have been completely refurbished. We would like to ask that if you will be using the pool area that you cover the chaise lounge with a towel prior to using as the oils along with the sun exposure will stain them again. We appreciate your cooperation. We are now refurbishing the chairs on the pool deck to match the chaise lounges.
Elevator Tile
The elevator tiles are cracked and will be replaced moving forward. We have not chosen a tile or design as of yet. This is a project which will be done, however we don’t have an exact date yet. We are currently getting prices from tile companies for the installation. We will have tile samples within the next 30 days.
Hallway Painting
We are continuously painting the hallway lobbies on all floors, we are currently in building A, 14th floor and working our way down, once completed we will be retouching building B and plan to continue this pattern twice per year or more if needed.
Rotunda Planters Our staff is stripping the exterior paint on the rotunda planters in order to remove years and years of painting over, then pressure washing followed by sealant then paint.
Support Beams
We have during the past 5 to 6 years installed support beam all throughout the garage and are currently painting them white. This is steel and needs to be painted in order to prevent any damage due to the exposure to sea air.
Service Road
We are pressure washing service road and repainting curbs in order to maintain a pristine look throughout.
Metal Doors
We have several metal fire rated doors throughout the property which need to be replaced due to years of wear and tear. We are currently gathering information on companies and getting prices for same. No date on when this will be done as of yet.
Laundry Room
We currently are looking at two options for the Laundry room; either lease equipment form a company (new equipment) or purchase new equipment straight out as we have now. We are looking at installing washer /dryer combo’s and thereby increasing the number of machines to 14. We have not made any decisions with respect to his, however are diligently working on this in order to move forward quickly.