BoMax Hydrogen
📢 IEA Hydrogen TCP Annual Report 2025: Insights from our Chair
In our Annual Report 2025, our Chair, Paul Lucchese, shares a strategic perspective on the hydrogen sector's current phase of "industrial maturation."
As Paul highlights, the industry is moving beyond pilot projects to large-scale deployment. He emphasizes that navigating this complexity requires more than just technology, it demands innovation, smarter system integration, and, above all, strengthened global collaboration.
Our Annual Report captures this strategic vision, providing the technical foundation and policy insights needed to scale hydrogen effectively in an evolving energy landscape.
đź”— Read the full message and explore our latest report: https://lnkd.in/emFWU75U
LinkedIn This link will take you to a page that’s not on LinkedIn
05/13/2026
Austria - BMW Group has awarded the French green hydrogen supplier Lhyfe a multi-year contract to supply its Steyr site in Austria. The hydrogen supplied by Lhyfe will be used for series development, industrialisation, testing and validation. The long-established manufacturing plant at Steyr is developing a hydrogen fuel cell system with production planned to start there in 2028.
"As a producer and supplier of green hydrogen in Europe since 2021, Lhyfe has one of the largest bulk hydrogen transportation fleets in the European Union. In 2025, the company made more than 850 deliveries throughout Europe. It has installed four production sites in France and Germany – with a total production capacity of up to 8.5 tonnes of green hydrogen per day – and plans to commission two additional sites in France by the end of the year."
Matthieu Guesné, founder and CEO of Lhyfe: “BMW Group is one of the world’s leading mobility companies, whom we commend for its concrete commitment to the energy transition in a sector set to undergo profound transformation. For Lhyfe, being chosen to support the industrial development of its fuel cell technology is strong recognition not only of our expertise, but also of our ability to guarantee a reliable supply that meets the standards of major manufacturers.”
Lhyfe press release - https://lnkd.in/d6rgB3Aa
04/27/2026
International Energy Agency (IEA)
Global electricity demand grew more than 2x as fast as overall energy demand in 2025, with electrification & AI expanding strongly
Energy demand growth in the US reached one of its fastest rates this century while growth in emerging economies slowed 👉 https://iea.li/3OUFPGc
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Merritt Island, FL
32953
Opening Hours
| Monday | 9am - 5pm |
| Tuesday | 9am - 5pm |
| Wednesday | 9am - 5pm |
| Thursday | 9am - 5pm |
| Friday | 9am - 5pm |