INPS Transit Solutions

INPS Transit Solutions

Share

04/20/2026

INPS is a sponsor at the RedCabin Railway Interior Innovation Summit USA, which takes place on May 12-14 in Washingston D.C.

Our Transit division specializes in enhancing rail passenger environments, delivering interior solutions engineered for the unique demands of rail travel. In a setting where every surface is on display, INPS combines durability, compliance, and design excellence to create interiors that perform in the real world.

Our portfolio spans decorative over‑laminates, wall foils and patterns, gel‑coated fibreglass panels, precision‑extruded profiles and thermoformed components with premium finishes.

Safety, accessibility and maintainability sit at the core of INPS’s approach. Our HPPL signage, low‑level exit path markings, LED‑illuminated signs, braille signage and regulatory decals meet FRA and APTA requirements, while components are engineered for ease of cleaning, replacement and graffiti resistance.

A single-source partner for every surface and purpose-built solutions engineered specifically for passenger rail.

See you there.

INPS FIREFLY Photoluminescence - International Name Plate Supplies Ltd. 03/03/2026

FIREFLY is another innovative product line developed by our engineering team at International Name Plate Supplies Limited. The requirement for an improved egress system that met and exceeded industry standards resulted in the development of LLEPM and HPPL Emergency Signage (FIREFLY).

American Public Transportation Association
Association of American Railroads

INPS FIREFLY Photoluminescence - International Name Plate Supplies Ltd. Find durable hardware for signs and posts at INPS. Ensure secure, compliant street signage and accessible parking solutions for all needs.

Photos from INPS Transit Solutions's post 01/26/2026

Ontario Line - A new 15.6-km subway line in Toronto that will run from Exhibition Place, through downtown, all the way to Line 5 Eglinton at Don Mills Road.

The line will bring 15 new stations to the city and will run from Exhibition Place, through the heart of downtown, all the way to Line 5 Eglinton at Don Mills Road.

It will give people more time back in their days, with a trip from one end to the other taking less than 30 minutes compared to the 70 minutes it takes on transit today. There will also be significant relief from crowding throughout the existing transit network thanks to connections to more than 40 other travel options along the way, including the TTC’s Line 1 and Line 2, three GO Transit rail lines, and the Eglinton Crosstown LRT.

01/22/2026
Photos from INPS Transit Solutions's post 01/21/2026

INPS provided 64 decal sets for the Stadler DART (Dallas Area Rapid Transit) for the new Silver Line Regional Rail Project. The complete exterior decal kits were installed by our INPS Installation team.

Want your business to be the top-listed Equipment Service in Longview?
Click here to claim your Sponsored Listing.

Telephone

Address


2905 W Marshall Avenue
Longview, TX
75604

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm