Stored Energy Systems
06/16/2026
Who is your local critical power expert? Below you can find the full list of our Industrial Power Representatives by territory.
We work with a dedicated network of industrial representatives across North America to ensure you get immediate, specialized support for your specific application:
Blackmon Agency Inc. | Regions: AL, FL Panhandle, MS, TN
CM Buck & Associates Inc. | Regions: IN, KY, MI, OH
Double E Engineering Sales, Inc. | Regions: LA, OK, TX
Electritek, LLC | Regions: FL
Haddon-McClellan Associates, Inc. | Regions: GA
HiReli LLC | Regions: CT, DC, DE, MA, MD, ME, NH, NJ, NY, PA, RI, VA, VT
Midwest Electrical Solutions | Regions: IL, MN, ND, SD, WI
Matzinger Keegan, Inc. (MKI) | Regions: CA, HI, NV
PL&E Sales, Inc. | Regions: NC, SC
Renosa Corporation | Regions: AK, ID, MT, OR, WA, BC
Whether you are optimizing backup starting systems or upgrading industrial DC power plants, our partners are on the ground ready to help streamline your project delivery.
Find your local representative here: https://hubs.ly/Q04l3C0S0
06/11/2026
The massive but variable power demands of AI data centers require re-engineering the entire powertrain. It is a subject we feel strongly about at SENS, which is why were inspired by a particular panel discussion this week at the 7x24 Exchange International 2026 Spring Conference:
"๐๐จ๐ฐ๐๐ซ๐ข๐ง๐ ๐๐ ๐๐ญ ๐ญ๐ก๐ ๐๐๐ ๐ ๐จ๐ ๐ญ๐ก๐ ๐๐ซ๐ข๐: ๐๐๐ฐ ๐๐ซ๐๐ก๐ข๐ญ๐๐๐ญ๐ฎ๐ซ๐๐ฌ ๐๐จ๐ซ ๐๐๐ฅ๐ข๐๐๐ข๐ฅ๐ข๐ญ๐ฒ, ๐๐ง๐ญ๐๐ซ๐๐จ๐ง๐ง๐๐๐ญ๐ข๐จ๐ง, ๐๐ง๐ ๐๐ญ๐๐๐ข๐ฅ๐ข๐ญ๐ฒ" with Philip Fischer (Black & Veatch), Joshua Fluecke (Syska Hennessy Group), Douglas Golden (Core Scientific) and Brad Witter (Generac), moderated by Generac's Emanuele Mule.
There was a lot to digest, but in short: AI needs more than just "more power". It has injected the whole dynamic of data center design with tremendous uncertainty:
>> Transient loads fluctuating by tens of MW within seconds
>> Planning challenges due to a lack of historical AI load data
>> Rapid change: trying to plan for a moving target
>> Application variability: there is no universal data center architecture
There may be no one-size-fits-all solution, but a systems approach can eliminate some of the uncertainty in data center design compared to a piecemealed approach.
Find out more about how factory-integrated power systems support this new power backbone, alleviating supply chain headaches while getting data centers energized faster:
https://hubs.ly/Q04l2LmK0
06/09/2026
At SENS, system integration is one of our core competencies, right alongside manufacturing. Every product we build is driven by a clear purpose: meeting our customersโ most critical power needs.
Several months into his role as CEO, Stamenkovic is already leaving a clear mark on how we think about our products and our customers. Rather than leading from a distance, he's embedded in conversations about integration, control logic, and the real-world demands our customers face - the kind of detail-oriented leadership that reflects his background driving innovation across the power systems industry.
"The industry is moving fast toward smarter, more integrated systems," Igor said. "SENS has the expertise and legacy to lead that shift - and it all starts here with the people building our products."
It's exciting to see this focus on innovation while staying true to the reliability SENS is known for. Igor's vision is clear: evolve our power solutions to meet tomorrow's demands.
Click here to claim your Sponsored Listing.
Category
Contact the business
Address
375 Disc Drive
Longmont, CO
80503