CBC Design Group

CBC Design Group

Share

​Harvard study: North South Rail Link would cost less than previously thought - Boston Business Journal 08/17/2017

3.8bn to 5.8bn range may seem like a lot of money, but when the state is considering (and favoring) a plan that will cost 2-3bn and will not address, but potentially increase the problems of train congestion at our stub end terminals, this project only makes more and more sense.

​Harvard study: North South Rail Link would cost less than previously thought - Boston Business Journal A new analysis shows the nearly three-mile tunnel connecting North and South stations could be built for between $3.8 billion and $5.8 billion — significantly smaller than the most recent previous cost estimates.

Massachusetts awards $1.5M contract to study North South Rail Link - Boston Business Journal 07/05/2017

A step in the right direction to completing our rail network for a more complete transit system.

Massachusetts awards $1.5M contract to study North South Rail Link - Boston Business Journal The study, due to be completed by spring of 2018, is being commissioned by the Massachusetts Department of Transportation’s Office of Transportation Planning.

Photos 05/07/2017

"The beauty of a Neighborhood"...

Want your business to be the top-listed Contractor in Lancaster?
Click here to claim your Sponsored Listing.

Telephone

Address


Lancaster, MA
01523