SunSmart Engineering
07/07/2026
SunSmart Partner Plug:
SunSmart Engineering provided engineering plans for permitting for a beautiful 18’x 34’ pool/spa combo & paver deck installed by Dolphin Pools & Spas in Palm Beach Gardens, FL. The pool is complete with Hayward automation, variable speed pump, LED bubbler, LED lights, and Built Right heat pump pool heater. A stunning addition designed to elevate both the beauty and enjoyment of this outdoor living space.
☀️🏊♂️ 😎 Palm Beach Gardens, FL
SunSmart Engineering - SunSmartEngineering.com
Dolphin Pools & Spas - dolphinpoolsnspas.com
07/02/2026
Happy Independence Day from all of us at Sunsmart Engineering!
As we celebrate the Fourth of July, we're grateful for the freedom, opportunity, and community that make what we do possible. We hope you and your loved ones enjoy a safe and happy holiday weekend filled with sunshine, good company, and a little well-earned rest.
Please note: our offices will be closed Friday, July 3 in observance of the holiday. We'll be back and ready to help on Monday.
Wishing everyone a bright and happy Fourth! ✨
What the One Big Beautiful Bill Changed for Commercial Solar (2026)
The 30% commercial solar credit did not go away. The deadline did.
Caleb Quaid, President of Clean Energy Help, breaks down the two things the One Big Beautiful Bill actually changed for commercial solar: the placed-in-service deadline moved from 2032 to the end of 2027, and FEOC sourcing compliance is now mandatory to claim the credit. Residential is finished. Commercial is very much alive, but keeping the credit now comes down to timing, sourcing, and documentation.
This is a clip from the panel "Commercial Solar in 2026: Deadlines, Credits, and Smarter Design."
Presented by SunSmart Engineering , Energy Help, and Florida Solar: FlaSEIA
What the One Big Beautiful Bill Changed for Commercial Solar (2026)
The 30% commercial solar credit did not go away. The deadline did.
Caleb Quaid, President of Clean Energy Help, breaks down the two things the One Big Beautiful Bill actually changed for commercial solar: the placed-in-service deadline moved from 2032 to the end of 2027, and FEOC sourcing compliance is now mandatory to claim the credit. Residential is finished. Commercial is very much alive, but keeping the credit now comes down to timing, sourcing, and documentation.
This is a clip from the panel "Commercial Solar in 2026: Deadlines, Credits, and Smarter Design."
Presented by SunSmart Engineering , Clean Energy Help, and Florida Solar: FlaSEIA.
Educational information only, not tax, legal, or engineering advice. Rules referenced were current as of June 2026 and continue to change. Confirm current requirements with a qualified professional before acting.
06/25/2026
SunSmart Partner Plug:
SunSmart Engineering provided design & engineering services for a colossal 4,000 square foot solar pool heating system installed by Solar Trek in Bronson, FL. The Heliocol system was installed using custom-built aluminum ground-mount structures and utilized a 5 HP variable speed, dedicated pump from Pentair to heat the resort’s large, outdoor pool. The project brought unique challenges but the successful installation and implementation of the solar pool heating system helps provide fuel-free pool heating nearly year-round!
☀️🏊♂️🔥 Bronson, FL
SunSmart Engineering - sunsmartengineering.com
Solar Trek - gosolartrek.com
06/18/2026
We had a great time at the FRSA Trade Show last week!
Thank you to everyone who visited our booth! It was a pleasure meeting you.
From structural engineering support to resolving missed inspections, SunSmart Engineering helps keep projects moving and code-compliant.
06/16/2026
Commercial Solar in 2026 - Free Live Webinar
June 23, 2026 • 11:00 AM ET
Hosted by:
SunSmart Engineering + + Florida Solar: FlaSEIA
Join us for one clear hour on where commercial solar stands - and where it’s headed!
We’ll cover:
• Tax credits and upcoming cutoffs
• Domestic content & sourcing rules
• Code updates
• Engineering decisions that keep large projects on schedule
Hosted by teams behind 2+ GW of solar design and $750MM in clean energy projects.
Register now.
www.sunsmartengineering.com/webinar
06/10/2026
We’re excited to be at the FRSA (Florida Roofing & Sheet Metal Contractors Association) Trade Show June 11–12! Stop by Booth 336 to meet the team and see how RoofLetters.com helps streamline your roof documentation - fast, accurate, and contractor-friendly!
Come say hi and let’s talk your next project. ☀️
06/04/2026
SunSmart Partner Plug:
SunSmart Engineering provided engineering plans for permitting for a beautiful 18’x 33’ pool/spa combo & paver deck installed by Dolphin Pools & Spas in Jupiter, FL. The pool is complete with Hayward automation, variable speed pump, LED bubbler, LED lights, (3) sheer descents on a raised wall, and Built Right heat pump pool heater. This project is a great example of how smart engineering and skilled construction can transform an outdoor space into a relaxing backyard escape!
☀️🏊♂️ 😎 Jupiter, FL
SunSmart Engineering - sunsmartengineering.com
Dolphin Pools & Spas - dolphinpoolsnspas.com
05/28/2026
Engineering solutions that deliver! ⚡️
Premium engineering - built for performance.
What we do (and how we make your projects easier!)
🏗️ Structural engineering
🌿 Outdoor environment (pools, enclosures, site/drainage)
☀️ Renewable energy (PV, storage, thermal, EV)
🏠 Roofing & exteriors
🔎 Due diligence
✅ Engineering consulting (code + permitting support)
Let’s get your next project moving—fast!
Click here to claim your Sponsored Listing.
Category
Contact the business
Address
255 Primera Boulevard, Suite 160
Lake Mary, FL
32746
Opening Hours
| Monday | 9am - 5pm |
| Tuesday | 9am - 5pm |
| Wednesday | 9am - 5pm |
| Thursday | 9am - 5pm |
| Friday | 9am - 5pm |