Jackola Engineering and Architecture
Nearby realtors & realty services
402 E 1st Street Suite 104, Cle Elum
05/20/2026
โก๐๏ธ Constructed in 2024, Maddox Industrial Transformerโs newest expansion in Battle Ground, WA continues to strengthen the companyโs transformer refurbishment operations while creating improved spaces for the people behind the work.
The 6,000 SF two-story addition includes new office and conference spaces, expanded storage areas, and a large shared break room supporting both shop and office teams.
Connected to the original 16,585 SF refurbishment facility, the campus was designed around specialized industrial workflows with full-length crane rails, semi-truck delivery access, integrated production support spaces, and durable materials built for long-term performance.
Special shoutout to Tapani Inc. for helping bring the project together through self-performed sitework, structural concrete, and steel installation, creating a smooth integration with the existing facility. ๐
Click here to claim your Sponsored Listing.
Contact the business
Telephone
Address
2250 US Highway 93 S
Kalispell, MT
59901
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |