Photos from JB Mobile LLC's post 03/23/2026

Machined an equalizer bar, and main frame center pin on a 963B. The main frame was machined as a dead hole. This means we could not have a bearing set up on the inside, we had to do an intermediate bearing in between the pin bosses. This is because the fuel tank is set in the frame right up against the bore, and would otherwise have to be removed.

Photos from JB Mobile LLC's post 03/06/2026

Here's an interesting project we had this week. We were hired to drill, tap, and counterbore for retainer bolts in 20 manholes at the new Levinworth penitentiary.

Photos from JB Mobile LLC's post 11/21/2025

Repaired a set of D10T lift cylinder yoke

10/24/2025

It's been a very busy summer with a lot of big events taking place. Hopping that as we move into the winter we can start getting some posts put up and get everyone up to date.

Want your business to be the top-listed Engineering Company in Holden?
Click here to claim your Sponsored Listing.

Website

Address


Holden, MO