Titus Contracting
01/09/2024
Cleared out some snow to get 4 of these frost posts in the ground, and finished off the day getting our machine and some materials in place to start up a 70’ long Boulder wall tomorrow.
Precast concrete frost posts (also called deck footings) are typically used to support decks and porches. For these applications, frost posts are installed in the ground below the frost line, with only the tops exposed.
A homeowner walking her dog stopped by one of our sites and said she, her husband, and general contractor couldn’t find anyone to dig their foundation. We made an extra effort to squeeze them in and get their project moving before the ground freezes.
Titus Contracting
Titus contracting, family owned since 1986.
Custom home building, remodeling, and excavation.
Perfomance driven & competitively priced.
01/05/2024
Wrapped up the excavation for this addition today.
We did this foundation in two segments, so the builder could get going on the main house while we completed the breezeway and garage.
Building by KC White.