Photos from Triangle Contracting, LLC's post 10/23/2023

Embankment reconstruction getting underway. Using Portdam to maintain 8-foot pond depth during the restoration of the embankment, new overflow riser, 60” reinforced concrete pipe outfall and fishing pier.

Photos from Business in Frederick's post 05/04/2023
04/22/2023

Very excited to be part of this valuable project in the District. Thank you to everyone involved.

https://www.facebook.com/105555972816705/posts/6104907456214830/?mibextid=DcJ9fc

Another one in the ground! Thank you to all that helped make our Tenleytown Bioretention a success! We couldn’t have done it without the support of our amazing community partner, Tenleytown Main Street. We had a lovely Ribbon Cutting Ceremony last week with representatives from DDOT, Department of Energy & Environment, PepcoConnect, Tenleytown Main Street, and Ward 3 Councilmember Matt Frumin. This project not only treats over 2,700 gallons of stormwater runoff, but also added traffic and pedestrian safety measures at the intersection. The design and construction was funded by DOEE through an EPA grant, the Ribbon Cutting Ceremony and maintenance training was funded by Pepco and Sustainable Maryland, and the bench was funded by Tenleytown Historical Society. CWP designed the project and Triangle Contracting, LLC constructed it. Thank you all our other supporters, DC Water, DC Office of Planning, Cafe of India, Le Chat Noir Restaurant, and ANC3E.

12/21/2022

Check out this matting installation clip from Pinecliff Park. The crew is pounding wooden stakes into newly graded slopes to secure the biodegradable coconut fiber matting. These slopes will help to connect the floodplain with the channel.

Photos from Triangle Contracting, LLC's post 12/16/2022

Just like the students at the University of Maryland, our crew is working hard at the end of the year!
Check out these images of the pipe bursting project on Knox Road in College Park, MD. This trenchless pipe replacement technique uses a bursting tool to force the existing pipe outward and leave a new pipe in its place. This method is safer, more cost effective, increases flow capacity, and causes less damage to the site than traditional pipe replacement strategies.

Want your business to be the top-listed Contractor in Frederick?
Click here to claim your Sponsored Listing.

Category

Telephone

Address


313 E 4th Street
Frederick, MD
21701

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm