Precise Building Contractors, Inc.
08/17/2021
July 2021: Roof project consisted of stripping off old roofing down to deck, install new plywood and synthetic paper. Installed new shingles and drip edge.
08/17/2021
Project in June 2021: Installed posts in ground with concrete with floor joists on girder system. Installed 14’x60’ deck with steps and rails on the main construction trailer at a major building project in Fort Wayne. Painted the steps and rails.
08/17/2021
Project in April 2021: Installed 2 niche cabinets with trellis at a local Fort Wayne Cemetery.
08/17/2021
Project in May 2021: Installed screen around existing covered porch.
08/17/2021
Project from March 2021: Removed existing concrete patio. Installed girder system, floor joists with bridging blocks and Trex deck with rail.
08/17/2021
Project in March 2021: Install 36” metal door, replace stairs and install a “Bilco” cellar door.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
Fort Wayne, IN
Opening Hours
| Monday | 9am - 5pm |
| Tuesday | 9am - 5pm |
| Wednesday | 9am - 5pm |
| Thursday | 9am - 5pm |
| Friday | 9am - 5pm |