Kiple Acquisition Science Technology Logistics & Engineering
05/16/2022
KASTLE has purchased a second diesel generator for the VVU Test Site. This new generator combined with our two Horlick power converters gives us enough US power (110/120 volts, 60 Hertz) to run any equipment needed for testing
KASTLE and VVU now have a 10,000 square meter test pad that is covered with EPDM rubber to keep the environment safe from any contaminant. We expect to keep the pad in place for 3 years.
10/01/2016
KASTLE receives a new contract from the US Army to conduct open-air chemical warfare agent testing of standoff detectors at the Vyskov, Czech Republic test site. The pictured device will contain agent vapors that will be detected and identified by the detectors. KASTLE will conduct decontamination testing on this contract in 2017.
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
1704 Connor Place
Forest Hill, MD
21050