Exigo Architecture

Exigo Architecture

Share

04/17/2024

Exigo is excited to announce La Nube’s grand opening on Saturday, August 10, 2024!

Exigo is proud to collaborate with Snohetta, a renowned design firm, in bringing to life La Nube, a whimsical children’s museum nestled in the vibrant heart of El Paso.

Design Team: Snøhetta, Exigo Architecture, Arup, Greenway, SER Group
Exhibits: Gyroscope Inc., kubik maltbie, Future Forms
Construction Manager: Jordan Foster Construction LLC
Owner Representative: Broaddus & Associates

Photos from Exigo Architecture's post 11/10/2023

“The architecture represents both the culture of EPW and the culture of the city itself through a recognition of not only how water (both above and below ground) connects these cultures across the city grid, the Franklin Mountains, and the geography in general, but also how architecture can express that context. The final design represents the intersection of the Franklin Mountains and the city grid: a mass versus a grid, with a connecting bridge in the center that consists of both closed and open collaboration spaces.”

Thank you to Texas Society of Architects/AIA for highlighting the New El Paso Water Headquarters, the importance of flexibility and functionality , and how we can apply sustainable principles to a building’s design.

Project team: Lake|Flato Architects, Arup , Ten Eyck Landscape Architects, Quantum Consultants

Read the full story by Dr. Mahyar Hadighi: https://magazine.texasarchitects.org/2023/11/09/new-headquarters-for-el-paso-water-underway/

Photos from Exigo Architecture's post 03/08/2023

In honor of International Women's Day and Women's History Month, we celebrate the remarkable contributions of women in Architecture. Exigo is proud to be a woman-owned firm that uplifts and empowers women in our community and across the profession.

We have asked some of our team members to share their thoughts on leadership and advice to guide others looking to forge their own paths.

Photos from Exigo Architecture's post 01/19/2023

The new El Paso Water Administration Building crafts 67,000 SF of high-performance workspace centered around the health and well-being of its occupants. In collaboration with renowned firms and , the design embodies EPWater’s innovative spirit as a steward of sustainable development. The site will incorporate native and drought-tolerant landscaping designed by and implement stormwater strategies to demonstrate how to sustainably utilize and develop land in the Chihuahuan Desert region. The El Paso Water Administration Building will house most of the utility’s operational departments, including engineering, and its projected 290 full-time employees. The first phase of the project, a two-story parking structure, will begin construction in late January. Our design team is enthusiastic about contributing to shaping the present and evolving identity of EPWater.

12/25/2022

From our team to yours, we wish you a wonderful Christmas and a Happy new year.

As the year draws to a close we look back at the great memories and we are grateful to our team members, clients, and colleagues for helping us keep making ideas into reality.

Want your business to be the top-listed Contractor in El Paso?
Click here to claim your Sponsored Listing.

Telephone

Address


211 N Florence Street Ste 101
El Paso, TX
79901

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 12pm