Photos from Bechtolt Engineering, Inc.'s post 07/28/2022

The finished product!

07/28/2022

Today, CDOT conducted the ribbon cutting ceremony for our Wildlife Overpass project. Bechtolt Engineering personnel are the Engineers of Record for both the Roadway Design and Construction Engineering/Management of the project. Personnel from both Bechtolt Engineering and Ralph L. Wadsworth Construction are pictured on the top of the overpass at the ribbon cutting ceremony.

09/22/2021

Setting the precast wildlife structure on US-160. Each half arch is approximately nineteen and a half tons. Two halves are swung in together and joined in the middle.