Rocky Mountain Division Modular Layout

Rocky Mountain Division Modular Layout

Share

Photos from Rocky Mountain Division Modular Layout's post 10/12/2025

We continue to work on refurbishing the RMH layout. Today’s session was re-installing the facia and testing the fit for the push buttons. We also did a bit of wire tracing. Soon we will start refurbishing the wiring.

Photos from Rocky Mountain Division Modular Layout's post 10/04/2025

Work continues on the layout refurbishing project

Photos from Rocky Mountain Division Modular Layout's post 09/28/2025

We are in the process of refurbishing the layout that was at the Ronald McDonald House for almost 18 years. We had to remove it due to construction at the facility. First up is replacing the front beam, facia and controls.

This is just one of 5 layouts our club can take on the road. We are hoping to take this one to libraries and Children’s Hospital. It has 3 loops of track as well as operating accessories, controlled by arcade style push buttons.

01/24/2024

Do not fall for this (phishing) scam:

>Verification Required for Potential Violation of Community Standards due to Image Use.<

This one came via email vs a Facebook message.

11/07/2022

From Lionel Trains:

YOU could WIN a Lionel The Polar Express™ Train Set!
Click the following link to enter: https://woobox.com/5juzwe

Want your business to be the top-listed Transport Service in Denver?
Click here to claim your Sponsored Listing.

Telephone

Address


Denver, CO