Rocky Mountain Division Modular Layout
10/12/2025
We continue to work on refurbishing the RMH layout. Today’s session was re-installing the facia and testing the fit for the push buttons. We also did a bit of wire tracing. Soon we will start refurbishing the wiring.
10/04/2025
Work continues on the layout refurbishing project
09/28/2025
We are in the process of refurbishing the layout that was at the Ronald McDonald House for almost 18 years. We had to remove it due to construction at the facility. First up is replacing the front beam, facia and controls.
This is just one of 5 layouts our club can take on the road. We are hoping to take this one to libraries and Children’s Hospital. It has 3 loops of track as well as operating accessories, controlled by arcade style push buttons.
Do not fall for this (phishing) scam:
>Verification Required for Potential Violation of Community Standards due to Image Use.<
This one came via email vs a Facebook message.
11/07/2022
From Lionel Trains:
YOU could WIN a Lionel The Polar Express™ Train Set!
Click the following link to enter: https://woobox.com/5juzwe
Click here to claim your Sponsored Listing.
Telephone
Website
Address
Denver, CO