Street Rod Engineering

Street Rod Engineering

Share

Photos from Street Rod Engineering's post 01/20/2020

Project Grumpy Old Van update. Front end is out and fine tuning the ride height. 4” drop in the front, 3” in the rear. This is a critical step. If you don’t have the right stance (tires, rims, rim offset, rake, turning radius) then even an expensive paint job won’t make it look right. Was having a hard time visualizing rake with all the rust holes, so I improvised and used some cheap painters tape to give it a solid look on the bottom half.

Time to start designing the MII IFS and Triangulated 4-link.

01/09/2020

Today we are bending 1” tubular dom for lower control arms. Check out the thickness of metal, 3/16” wall. We list it on all our parts. Our competitors use weaker steal, but you can’t see it after welded. Make sure you ask them if you order from someone else!

10/30/2019

It’s an addiction. Look for a MII kit for first generation Econolines late winter or early spring!

Want your business to be the top-listed Autos & Automotive Service in Cedar Rapids?
Click here to claim your Sponsored Listing.

Telephone

Address


1120 I Avenue NE
Cedar Rapids, IA
52404

Opening Hours

Monday 9am - 3:30pm
Tuesday 6:30am - 3:30pm
Wednesday 6:30am - 3:30pm
Thursday 6:30am - 3:30pm
Friday 6:30am - 3:30pm