Street Rod Engineering
01/20/2020
Project Grumpy Old Van update. Front end is out and fine tuning the ride height. 4” drop in the front, 3” in the rear. This is a critical step. If you don’t have the right stance (tires, rims, rim offset, rake, turning radius) then even an expensive paint job won’t make it look right. Was having a hard time visualizing rake with all the rust holes, so I improvised and used some cheap painters tape to give it a solid look on the bottom half.
Time to start designing the MII IFS and Triangulated 4-link.
01/09/2020
Today we are bending 1” tubular dom for lower control arms. Check out the thickness of metal, 3/16” wall. We list it on all our parts. Our competitors use weaker steal, but you can’t see it after welded. Make sure you ask them if you order from someone else!
10/30/2019
It’s an addiction. Look for a MII kit for first generation Econolines late winter or early spring!
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
1120 I Avenue NE
Cedar Rapids, IA
52404
Opening Hours
| Monday | 9am - 3:30pm |
| Tuesday | 6:30am - 3:30pm |
| Wednesday | 6:30am - 3:30pm |
| Thursday | 6:30am - 3:30pm |
| Friday | 6:30am - 3:30pm |