Medusa Development

Medusa Development

Share

04/21/2026

The tail end of kitchen tile.

Last week I ran out of adhesive with a small amount to go, and I shorted myself three tile cuts before I put away the tile saw on Friday - so this was my morning 🌄

I will say it was nice that everything around me was already set so that I didn't have to play Twister in order to avoid the wet parts.

🔵 🔴 🟡
🟢 🟣 🟠
🔵 🟡 🟢
🟣 🟠 🔵

Xoxo,
Medusa ♟️

04/21/2026

Last minute Tadelakt touch ups in the wet room before the Japanese soaking tub goes in.

The most challenging part about working with this medium has been flowing with the natural color variations. The raw lime comes as a powder and the tint came as a dilutable liquid in a separate container. In addition to that, the wet color is drasticly different than when dry.

This is a high-build labor intensive process that has taken several passes with ample dry time. Each fill coat ends up looking like a Jackson Po***ck until it's dry. (Slightly maddening for my inner perfectionist)

It's a full 24 hours until I get to find out if my tint ratios were correct. ⏳️

Patiently yours,
MEDUSA 🐍

Photos from Medusa Development's post 04/09/2026

Longevity > Vanity 🪞

Want your business to be the top-listed Realtor/realty Service in Buffalo?
Click here to claim your Sponsored Listing.

Address


Buffalo, NY
14213