Bauer Landscape Design
06/30/2015
I just finished this brick pathway for a customer, thought I'd show photos of the progression of this project.
First everything is dug to a depth of 8", the string line indicates how high my base needs to be.
Recycled concrete is added a few inches at a time and compacted until it's level with the string line, (about 4" depth). Now the hardest and most important part is done.
A 1" layer of sand is achieved by screeding it with a 2x4 along 1" conduit. And now for the easiest part...laying the pavers.
Cut the pavers, install plastic edging to hold pavers in place, add a layer of sand, then run the compactor over everything. Sweep in sand, sweep in sand again, and again...fix the grade, and voila.
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
Bloomington, IL
61704