Beamline 11.3.1 at the Advanced Light Source
08/21/2013
Time for some serious beamline upkeep! Everything that can be pumped down is getting some TLC.
Happy Pre-2-Bunch Shutdown, everyone! Time to crunch through all the data that has been ruthlessly piling up! 2-Bunch runs from Aug 27th until Sept 7th, with multibunch user beam returning on Sept 11
04/24/2013
Watch for 11.3.1 in 2001!
The ALS Beamline Clock A version of the Advanced Light Source (ALS) "beamclock" that marks time by the addition of beamlines to the facility from 1993 to 2013.
Click here to claim your Sponsored Listing.
Category
Address
1 Cyclotron Road
Berkeley, CA
94720