The Transtec Group

The Transtec Group

Share

GripTester: Measuring Airport Runway Friction Levels Before and After Shotblasting for Retexturing 11/23/2021

The San Antonio International Airport in San Antonio, Texas, required retexturing on Runway 13R/31L and hired Skidabrader to perform surface abrasion to enhance texture. Surface abrasion yielded the results they needed faster and more efficiently than other methods.

GripTester: Measuring Airport Runway Friction Levels Before and After Shotblasting for Retexturing GripTester: Measuring Airport Runway Friction Levels Before and After Shotblasting for Retexturing When planes land at airports, small amounts of rubber wear off the tires leaving a rubber residue behind on the runway. Rubber build up on the pavement causes a loss of friction that, if allowed to go....

Timeline photos 10/28/2021

We are looking for a full-stack, Azure .NET developer to join our team to develop two C # web applications.

Apply here: https://buff.ly/2Znj6IL

Harbor Bridge | Corpus Christi, Texas 10/25/2021

We optimized meeting time by coming to the table prepared with the right answer and a proper model for design. Eliminating the need to research, back-check, and schedule excessive follow-up meetings expedited the process and proved to be cost-effective.

Harbor Bridge | Corpus Christi, Texas Harbor Bridge | Corpus Christi, Texas This design-build project includes replacement of the existing Harbor Bridge and reconstruction of portions of US 181, I-37 and the Crosstown Expressway—a total of 6.44 miles of bridge and connecting roadway. The bridge will include

Want your business to be the top-listed Equipment Service in Austin?
Click here to claim your Sponsored Listing.

Telephone

Address


6111 Balcones Drive
Austin, TX
78731