Aqua Clear Septic Solutions

Aqua Clear Septic Solutions

Share

08/06/2018

Another set of ET Beds installed in Travis Co

Choosing a Septic System (On-Site Sewage Facility System) 08/03/2016

Standard disposal processes for Septic Tanks



Absorptive Drainfieldsare:
-constructed with perforated pipe and gravel.
-installed by an Installer Class I or Installer Class II.
-sized and constructed in accordance with §285.33(b)(1).

Unlined Evapotranspiration (E-T) systems:
-are constructed with either pipe and gravel, leaching chambers, or --gravel-less pipe in either a trench or bed configuration and backfilled with sand.
-can be installed by an Installer Class I or Installer Class II.
-are sized and constructed in accordance with §285.33(b)(2).

Lined Evapotranspiration (E-T) systems:
-are constructed similar to an unlined E-T bed with the exception of --an impervious liner being placed between the excavated surface and the constructed disposal system.
-can only be installed by an Installer Class II.
are sized and constructed in accordance with §285.33(b)(2).

Pumped Effluent Drainfields (PEDs):
-dispose of effluent by use of a pump into small diameter perforated pipe in gravel.
-can be installed by an Installer Class I or Installer Class II.
-are sized and constructed in accordance with §285.33(b)(3).

http://www.tceq.state.tx.us/licensing/ossf/ossfsystems.html

Choosing a Septic System (On-Site Sewage Facility System) Reference table to determine the type of septic system (OSSF) that is suitable for your property. Brief descriptions of treatment and disposal systems.

Want your business to be the top-listed Contractor in Austin?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Austin, TX
78719