Aqua Clear Septic Solutions
08/06/2018
Another set of ET Beds installed in Travis Co
08/03/2016
Standard disposal processes for Septic Tanks
Absorptive Drainfieldsare:
-constructed with perforated pipe and gravel.
-installed by an Installer Class I or Installer Class II.
-sized and constructed in accordance with §285.33(b)(1).
Unlined Evapotranspiration (E-T) systems:
-are constructed with either pipe and gravel, leaching chambers, or --gravel-less pipe in either a trench or bed configuration and backfilled with sand.
-can be installed by an Installer Class I or Installer Class II.
-are sized and constructed in accordance with §285.33(b)(2).
Lined Evapotranspiration (E-T) systems:
-are constructed similar to an unlined E-T bed with the exception of --an impervious liner being placed between the excavated surface and the constructed disposal system.
-can only be installed by an Installer Class II.
are sized and constructed in accordance with §285.33(b)(2).
Pumped Effluent Drainfields (PEDs):
-dispose of effluent by use of a pump into small diameter perforated pipe in gravel.
-can be installed by an Installer Class I or Installer Class II.
-are sized and constructed in accordance with §285.33(b)(3).
http://www.tceq.state.tx.us/licensing/ossf/ossfsystems.html
Choosing a Septic System (On-Site Sewage Facility System) Reference table to determine the type of septic system (OSSF) that is suitable for your property. Brief descriptions of treatment and disposal systems.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Austin, TX
78719