ModdLiving
09/24/2015
Ground up project development built FASTER...STRONGER...BETTER 2 for 1 JV options available A quicker return on investment modular means more income. A shorter build time – With modular construction, the foundation and the building can be bu
09/24/2015
A shorter build time – With modular construction, the foundation and the building can be built at the same time. Factory-based pre-fabrication also speeds up the process, giving modular construction an average 20 to 30% time savings over traditional construction. That’s just the average. A Florida Assisted living project 52 beds thttp://www.bradenton.com/2014/11/15/5475615/modular-bradenton-senior-care, which would have taken a full year to build using traditional construction techniques has a planned start-to-finish modular construction timeline of about five months. And a 15-story Ark Hotel in China took just 48 hours to complete, as evidenced by this time-lapse YouTube Video below.
Ark Hotel Construction time lapse building 15 storeys in 2 days (48 hrs) disclaimer: The Ark Hotel Video is copyright free. Please feel free to use it for any purpose. visit: www.broad.com for more information Level 9 Earthquake R...
05/23/2015
This is exciting to be apart of, the wave of the future in commercial construction..
10 days, 6 levels, 77 homes – New building uses unique prefabricated construction system A 6-storey modular apartment building was installed in just 10 days using an innovative Australian modular system. Whilst site preparations and base building...
Click here to claim your Sponsored Listing.
Category
Website
Address
1106 SH 360, Ste 420A
Arlington, TX
75050