IDanielMedrano
We’ve officially hit another major milestone.
The framing is now complete, including the entire second story. The layout is fully taking shape with all three bedrooms, two and a half bathrooms, and the open concept kitchen and living area now framed in.
We’ve also completed the rough plumbing and electrical, and at this point I’m waiting on the fire sprinkler installation and final approval before moving into insulation and drywall.
Every week this project gets one step closer to becoming a finished home, and I’m documenting the entire process from permits and inspections to construction costs, design decisions, and everything in between.
Follow along because the next phase is where this ADU really starts to transform.
This is the last progress update before the big reveal.
From demolition and unexpected setbacks to design selections, construction, and bringing the vision to life, this Whittier remodel has come a long way.
This sneak peek is a look at how the transformation is coming together before the final reveal.
It’s been a journey of problem solving, thoughtful design, quality craftsmanship, and creating a home that feels warm, modern, and functional.
One more video to go.
Follow along for the final reveal and see how this $580K Whittier flip turns out and if this deal was a win 🏆
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
388 E Valley Boulevard STE 106
Alhambra, CA
91801