The Third Ring Road of Tripoli is a crucial ring road for the traffic of Libya's capital, spanning approximately 24 km. It connects the second ring road in the west to Al Fatah Road in the northeast, featuring 2×3 lanes and a total width of 30.60 m. The project included a revision of the original plan to optimize costs, functionality, and feasibility, highlighting the use of prefabricated concrete elements for structures and alternative systems for retaining walls.

The structures include spans ranging from 3 to 11, specific pillars, and indirect foundations. The IC12 and IC13 junctions required 100,000 m² of deck, with the IC13-2 viaduct standing out at 334 m long and spans of up to 52 m, due to the use of in-situ box girders and a distinctive design. All prefabricated concrete elements were produced at a site specifically set up for the project.

We are happy to announce that, after 13 years, we have returned to Libya and the TRR, providing technical assistance, new studies, and solutions. We are proud to take part in this project, which we hope will play a key role in improving the city's mobility.

Pictures by: https://lnkd.in/d7sUAmUK

------------------------------------------------------------------------------------

A Terceira Circular de Trípoli é um anel rodoviário essencial para o tráfego da capital da Líbia, com cerca de 24 km de extensão. Liga o segundo anel rodoviário, a oeste, à Al Fatah Road, no nordeste, contando com 2×3 vias e uma largura total de 30,60 m. O projeto incluiu a reformulação do plano original para otimizar custos, funcionalidade e exequibilidade, destacando-se o uso de elementos pré-fabricados em betão para obras de arte e sistemas alternativos para muros de suporte.

As obras de arte incluem estruturas com 3 a 11 vãos, pilares específicos e fundações indiretas. Os nós IC12 e IC13 exigiram 100.000 m² de tabuleiro, destacando-se o viaduto IC13-2, com 334 m e vãos até 52 m, devido ao uso de vigas caixão in situ e um design diferenciado. Todos os elementos pré-fabricados em betão foram produzidos num estaleiro criado para o projeto.

Estamos felizes de divulgar que ao fim de 13 anos regressamos à Libia, ao TRR; com assistência técnica, novos estudos e soluções e que estamos orgulhosos de participarmos neste projeto que esperamos que tenha um papel preponderante na renovação da mobilidade da cidade.

Fotografias por: https://lnkd.in/d7sUAmUK

09/12/2024

In recent years, companies are drastically changing the way they operate in light of a new environmental awareness, a public concern about sustainable development and increasingly strict environmental protection laws and regulations.

In this context, GEG presents itself as a partner in the development of studies and designs in each of the three vectors we consider fundamental in this area, namely Water, Environment, and Energy.

We have a high level of proficiency and work with our clients and partners to develop solutions of excellence that strike the balance between the need for development and growth and respect for the environment.



--------------------------------------------------------------------------

Nos últimos anos as empresas estão a alterar drasticamente a forma como operam à luz de uma nova consciência sobre o ambiente, da preocupação pública sobre o desenvolvimento sustentável, das leis e regulamentações de proteção ambiental cada vez mais rigorosas.

Neste contexto, o GEG apresenta-se como um parceiro no desenvolvimento de estudos e projetos em cada um dos três vetores que consideramos fundamentais neste domínio, designadamente a Água, o Ambiente e a Energia.

Possuímos um elevado nível de proficiência e trabalhamos com os nossos clientes e parceiros no desenvolvimento de soluções de excelência, que encontrem o equilíbrio entre a necessidade de desenvolvimento e crescimento e o respeito pelo meio ambiente, através da conjugação dos requisitos legais ou normativos e as melhores soluções de conceção e projeto.

Quer que o seu negócio seja a primeira Serviço De Equipamentos em Porto?
Clique aqui para solicitar o seu anúncio patrocinado.

Endereço


Rua Justino Teixeira, Empr. Centro Campanhã, Escritório 307
Porto
4300-273

Horário de Funcionamento

Segunda-feira 09:00 - 19:00
Terça-feira 09:00 - 19:00
Quarta-feira 09:00 - 19:00
Quinta-feira 09:00 - 19:00
Sexta-feira 09:00 - 19:00