S.H.R CON
24/04/2025
Design of Steel Structure Solar System 20 KW on Roof-Top Floor 4,500 SqFt. Area.
Services for Client Included :
Architectural Design and Drawings
Structural Design and Drawings
3D Modeling and Rendering
Autocad 3D Designs
Fabrication Drawings and Detailing
Er****on & Installation plans.
Feel Free to contact for your queries via email and whatsapp.
The steam boiler and furnace have been placed at the designated location, followed by the installation of the economizer and air preheater. Fabrication and installation of carbon steel (CS) ducts are in progress, ensuring proper alignment and connectivity for efficient steam and flue gas flow. The work is proceeding as planned, with a focus on quality, safety, and timely ex*****on.
For inquiries & consultancy contact us or visit our website at www.shrcon.com.
Auxiliary Boiler Installation
Follow to Watch the complete process of auxiliary boiler installation, from setup to commissioning. This video covers placement, piping, connections, and key considerations for smooth operation. Ideal for industrial and commercial applications.
Follow for more engineering insights! 🔧🔥
Our team is working diligently to ensure every phase of the project meets the highest quality and safety standards. Stay tuned for more updates as we move closer to completing these critical water storage solutions for the energy sector.
Click here to claim your Sponsored Listing.
Contact the business
Telephone
Website
Address
Main Jinnah Avenue
Karachi
Opening Hours
| Monday | 09:00 - 17:00 |
| Tuesday | 09:00 - 17:00 |
| Wednesday | 09:00 - 17:00 |
| Thursday | 09:00 - 17:00 |
| Friday | 09:00 - 17:00 |
| Saturday | 09:00 - 17:00 |