The NeXt
29/11/2025
THIS MORNING: PBBM leads the inauguration of the Angat Water Transmission Improvement Project (AWTIP) Tunnel No. 5, with the unveiling of the project marker at the Bigte Basin in Barangay Bigte, Norzagaray, Bulacan. The project includes a 4.30-meter-diameter, 6.40-kilometer-long raw water conveyance tunnel designed to carry up to 1,642 million liters per day (MLD). Its main purpose is to provide redundancy and resilience by diversifying water transmission pathways, enable maintenance sequencing of upstream tunnels and downstream aqueducts, and improve system reliability in the face of seismic and other natural hazards.
The AWTIP marks a crucial step in strengthening Metro Manila’s water supply for approximately 20 million residents in the National Capital Region (NCR) and nearby provinces, providing increased reliability and flexibility, and reducing vulnerability to disruptions in the coming decades.
24/11/2025
wag daw kayu paasa hah 🤣🤣🤣
ctto
Click here to claim your Sponsored Listing.
Category
Culinary Team
Attire
Contact the business
Telephone
Address
Solano
24/11/2025