Global Formwork Solutions

Global Formwork Solutions

Share

Photos from Global Formwork Solutions's post 17/05/2023

Design Stage:
This formwork traveler design for Cross Passage (CP) Tunnel was made possible through thorough discussion with client and understanding their need of formwork solution. The traveler has to lower down by more than 1 meter to pass through an overhead cast structure at the end of CP. The solution was to introduce an adjusting leg composed of inner and outer tube fitted with hydraulic jack inside. This allows the operation and moving of the traveler to be quickly executed from one CP to another thus saving cost and time, a significant aspect in a construction world.

Photos from Global Formwork Solutions's post 02/01/2023

From concept to design and to er****on, GFS successfully provided a solution of steel bracket support during construction of a massive pierhead. The pierhead is located nearby a nullah where erecting a traditional birdcage shoring is prohibited. GFS designed and provided drawings for steel bracket with cantilevers at both ends, supporting weight of pierhead at estimated 600 tons of reinforced concrete. The weight is then transferred from steel bracket into the supporting heavy duty shoring towers. With concerted effort and our engineer’s experience and creativity, we find solutions to challenging construction temporary works.

Fly through M+ 05/11/2021

Quick tour at M+ Museum

Fly through M+ M+, Hong Kong’s new museum of visual culture, opens to the public on 12 November. Ahead of what promises to be one of the most anticipated events of the year...

Want your business to be the top-listed Engineering Company in Misamis?
Click here to claim your Sponsored Listing.

Address


3/F Infinity Bldg. , Don Anselmo Bernad Avenue
Misamis
7200

Opening Hours

Monday 8:30am - 5:30pm
Tuesday 8:30am - 5:30pm
Wednesday 8:30am - 5:30pm
Thursday 8:30am - 5:30pm
Friday 8:30am - 5:30pm