Proposed Four (4) Storey Residence
Day 3 - Excavation work for footing along grid 2/B is completed and now ready for concrete pouring.
Project Notes:
* Footing size - 1.80m L x 1.80m W x 0.30m T
* Required footing depth - 2.00m
* Current excavation depth - 2.00m
* Need water pump prior to concrete pouring
* Four layers of slab on grade were demolished.
Day 1 - Excavation works for footing along grid 2/B and 2/C
Project Notes:
1. Footing size 1.80m L x 1.80m W x 0.30m T
2. Footing depth 2.00m