DC Squared Solar Power

DC Squared Solar Power

Share

27/01/2026

This is the sign to make that power move this 2026! ☀️

READ | DILG to LGUs: Fast-track net-metering applications to boost renewal energy adoption

In line with President Ferdinand Marcos Jr.’s directive to accelerate the country’s shift to renewable energy, the Department of the Interior and Local Government (DILG) is calling on all local government units (LGUs) to simplify and streamline the process of applying for net-metering installations.

Net metering, established under Republic Act No. 9513 or the Renewable Energy Act of 2008, allows households and businesses that generate their own electricity, such as through solar panels, to sell their excess power back to the grid. This system helps diversify the country’s energy mix while enabling consumers to reduce their electricity costs and recover investments in renewable energy systems.

To support this initiative, the DILG, together with the Department of Energy (DOE) and the Department of Public Works and Highways (DPWH), recently signed Joint Memorandum Circular (JMC) No. 001, series of 2026. The JMC provides clear guidelines to ensure faster, simpler, and more consistent processing of net-metering applications nationwide.

Under the JMC, LGUs are required to streamline documentary requirements and standardize processing timelines for net-metering installations in existing residential, commercial, and industrial establishments.

Electrical permit applications must be processed within three working days, while Certificates of Final Electrical Inspection (CFEI) must be issued within seven working days, in accordance with Republic Act No. 11032 or the Ease of Doing Business (EODB) Law. The JMC also enforces a “no additional requirements” policy and ensures the application of deemed approval in cases of inaction within prescribed periods.

LGUs are further encouraged to explore the use of digital solutions and strengthen internal data-sharing mechanisms to improve efficiency and reduce processing delays.

The DILG will oversee the implementation of the JMC in coordination with DOE and DPWH, including the conduct of capacity-building initiatives and compliance monitoring through the Ease of Doing Business Online Monitoring System.

Photos from DC Squared Solar Power's post 27/01/2026

Trusted by Engineering Professionals ☀️

When engineers choose solar, they choose it right.
Thank you Engr. Vener & Ma'am Nena Cudia of Malolos, Bulacan for trusting DC Squared Solar Power with your 10.44kWp Hybrid Solar Panel System with Net Metering, paired with a 300Ah 51.2V Battery for reliable and efficient energy storage.

A smart investment designed for performance, savings, and energy independence—approved by engineering professionals themselves. ⚡🔋

🔧 Installed by a company trusted by engineers

Want to cut your energy bills too?
📩 Send us a message for a free site assessment and learn how much you can save with solar!
💼 Net metering assistance also available.
Tel : (044) 813 6461
Mobile : 0943.348.2238
Office Address: Within Builder's Warehouse, Mc Arthur Highway, Malolos, Bulacan 3000

Want your business to be the top-listed Engineering Company in Malolos?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Bulihan
Malolos
3000

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm