As per IS 2911 & IS 456, the top portion of piles is intentionally broken after concreting to:
Remove weak and contaminated concrete (laitance, slurry, mud)
Expose sound concrete for proper bonding
Ensure correct anchorage of pile reinforcement into pile cap
Achieve required cut-off level (COL)
Enable safe and effective load transfer from structure to foundation
Breaking pile head is a mandatory site practice, not a defect. Only sound concrete + properly anchored steel should carry structural loads.
Reference: IS 2911 | IS 456:2000