WJS Realty

WJS Realty

Share

19/05/2026

Start building your future at New Castle 🏠
A home designed for comfort, convenience, and everyday happiness.
Reserve your unit today before prices increase! 🔑

12/05/2026

📍Commercial Lot for Sale in Brgy. Sta. Clara, General Trias, Cavite
Looking for the perfect location for your next business investment?
Secure a high-potential commercial lot in the fast-growing area of General Trias — ideal for commercial buildings, warehouses, apartments, or future business expansion.
✅ Strategic location
✅ Growing community & developments nearby
✅ Accessible to major roads
✅ Great long-term investment potential
Start your business where growth is happening.
Message us today for lot details, price, and site viewing! 🏗️📈

09/05/2026

A house is made of walls and beams; a home is built with love and dreams. Today, we’re celebrating the women who turn every room into a sanctuary. Happy Mother’s Day to the CEOs of the household, the bedtime storytellers, and the heart of every home.

26/04/2026

🏗️ 5 Build-Build-Build Projects Changing the Game for GenTri in 2026
If you’ve noticed more construction equipment around Governor’s Drive and Open Canal lately, here’s why. These 5 projects are slashing travel times and making General Trias the ultimate "Mid-Point Hub" of Cavite.
1. CALAX: Subsection 3 (Silang-Aguinaldo to Gov. Drive)
The Status: Slated to open this first half (H1) of 2026!
The Impact: This is the big one. It connects the Silang (Aguinaldo) Interchange directly to Governor’s Drive in General Trias. No more crawling through the usual Aguinaldo Highway traffic just to get to the expressway.
2. Bataan-Cavite Interlink Bridge (BCIB)
The Status: Major marine works bidding concluded in Feb 2026; full-scale construction is underway.
The Impact: While it’s a massive multi-year project, the "quality-first" push in 2026 is moving this 32km bridge forward. It will eventually connect Naic/Tanza/GenTri area to Bataan.
3. Daang Hari Extension (Open Canal Road) Widening
The Status: Ongoing road widening and flyover completions (like the Malagasang Flyover) are finalizing in 2026.
The Impact: The road connecting Imus to GenTri and Tanza is being transformed into a major commercial corridor. With SM City General Trias rising in the Riverpark township, this road is becoming the "New Daang Hari."
4. Cavite-Batangas Expressway (CBEX)
The Status: Joint venture between SMC and the Cavite Government. Construction is active with a 2026-2027 completion target.
The Impact: This 27km tollway starts at CALAX Silang and runs through Amadeo and Indang toward Nasugbu.
5. LRT-1 Cavite Extension (Phase 1 Operations)
The Status: With the new 4th-gen train sets fully certified, Phase 1 (Redemptorist to Dr. Santos) is easing the "first leg" of the commute for Caviteños.
The Impact: While the tracks haven't reached GenTri yet, the integration of the PITX and the extension makes the "Park and Ride" lifestyle much more viable for GenTri residents.

Want your business to be the top-listed Realtor/realty Service in General Trias?
Click here to claim your Sponsored Listing.

Website

Address


General Trias
4114