QB Engineers
22/05/2026
𝐓𝐡𝐞 𝟐𝐌𝐋𝐃 𝐏𝐫𝐨𝐣𝐞𝐜𝐭 – 𝐓𝐚𝐧𝐤 𝐆𝐞𝐨𝐦𝐞𝐭𝐫𝐲 𝐀𝐧𝐚𝐥𝐲𝐬𝐢𝐬
The 2MLD Project continues with the evaluation of reservoir geometry options through detailed structural and foundation analysis.
This phase compares rectangular and cylindrical tank configurations, highlighting their structural behavior, load distribution, and foundation response under full water loading conditions. Critical stress zones and base pressure concentrations are carefully assessed to determine the most efficient, stable, and practical solution for the proposed reservoir system. From geometry to performance, every detail is engineered with resilience and reliability in mind.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
Km. 8. 5, National Road
Corella
6337
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |
| Saturday | 8am - 3pm |