Trinder / Waimea Engineering
07/06/2026
This Bronze Aluminium precision-fabricated replacement is underway.
See the old component beside its new, expertly crafted replacement.
21/05/2026
The 2026 Next Gen Futures event is in full swing. Drop in and see the team at the Whanau and Public session tonight from 5:30-7:00 at Trafalgar Centre.
š£š¢š©
You've got a 50-tonne crane, a 7.5-tonne tank in the workshop... and still plenty of room to get the job done!
29/04/2026
Epic Bridge Upgrade
This project on a complex bridge site required the team to work carefully around existing steel structures and reinforcing steel while integrating new strengthening works. The Trinder team assisted by modelling the site conditions prior to final fabrication and installation, which helped clearly communicate the constraints faced by the site crews to the design team. This approach was particularly valuable in resolving clashes and ensuring the new works could be installed accurately and safely.
The bridge was originally constructed as a single-lane concrete structure, with a second lane later added using steel, which naturally experienced greater deflection than the original concrete section. To address this, we fabricated and installed a 600mm high, 10.5 metre long beam, welded to the underside of the existing bridge beam. This significantly improved structural integrity and reduced movement.
The team at Egypt value that this modelling and coordination support is included as part of Trinderās subcontract package, particularly when pricing and delivering complex works of this nature.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
1 MÄnatu Way
Nelson
7081
Opening Hours
| Monday | 7am - 4:30pm |
| Tuesday | 7am - 4:30pm |
| Wednesday | 7am - 4:30pm |
| Thursday | 7am - 4:30pm |
| Friday | 7am - 4:30pm |