AJR Building Solutions
27/04/2026
Long overdue Update! 📖
It has been a fast start to the year hence the long time between posts 🏃♂️
We have done busy in Lockerbie Village/ Estate building away in the subdivision here, whilst also fitting in the our town jobs in and around these builds 🏡
The clients have moved in out at the monster build in Sunridge park and will hopefully have a video tour of the house in the coming weeks. The Builds in the subdivision are cranking along and keep us busy the majority of the time! 🔨
But there is always room/time to accommodate other renovations or additions, decks, fences, bathrooms etc, we also work closely with sub contractors to make things happen for our clients aswell ( painters, plumbers, electricians, etc)
So please reach out if you need help or ideas on future projects we would love to make these a reality for you, in the mean time check out a few photos of the projects we have been working on 🎥
06/10/2025
3 weeks in, we have Frames up 🖼️ Steel installed, Roof Ready 🛖Building Wrapped🌯
This house has thrown us curve balls and we haven’t even gotten inside yet, but with steel beams/portals you can expect that!
We should have shelter by the end of next week with a sleek Tile roof being installed, running into a cantilevered Parapet Front entry roof with an internal gutter, Joinery arriving in a couple of weeks and then into one of the Rewarding parts which is the cladding!
Ticking away nicely with more updates to come once we commence cladding 🤙🏽
16/09/2025
⭐️ Sunridge update 🏠
Check out these foundation photos on our contract build in Sunridge! This thing is a sight for sore eyes! 👀 330sqm, 70% polished concrete, entire timber cladding, huge open plan dining/family/kitchen area with 8 steel beams running through out the build!
There is alot going on but this is a build where attention to detail is key for the clients which we pride ourselves on.
Photos of it taking shape as we build our way through to come 🎥
03/09/2025
🏠 330sqm Pad loading…
27/07/2025
The latest in Lockerbie Village 🏠
We have been flat tack since the start of the year. It’s been a challenge bouncing between our different builds at different stages but with the help of the PM’s it has gone smoothly so far
Check out some of the photos I’ve taken 📸 along the way(when I remembered) of different sites and builds. From Frames to Roof, Cavity system to Cladding 🪟 and then a few near complete photos of builds we started in January ☀️
Hopefully more to come 🔨
04/07/2025
Thanks to the team at Tg Branding for the gear, magicians 🪄
29/04/2025
🌟 Long time between posts as per usual…🥹
Some progress photos of Builds 1 and 2, these are probably a little dated as more has happened since then which I’ll update when I can 🔨
3rd Build has kicked off and already has roof on 🛖
Been slack on photos of this also as it’s been a busy period ⏰
We have managed to get a bit of work done outside of Lockerbie aswell which has kept us on our toes, we have very patient clients which helps us out a lot!
If your need of anything from building to painting dont hesitate to reach out, I’d be more than happy to help 👌🏾
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Hamilton